Construction and Commissioning of Twin Double Lane Standard Expressway Tunnel, Bridges and Expressway Works on Engineering, Procurement and Construction (EPC) Contract basis all complete. Dhedrekhola Ch- 30+695 to Lanedanda Ch- 35+316.
M/s. Structural Solutions of India was engaged by MS/Geo Engineering Pvt Ltd & M/s. Poly Changda Engineering Co,. Ltd to conduct pile integrity testing on R.C bored piles installed at Kathmandu Terai Madhesh Fast Track Expressway At Jitpur Khola Bridge 37 (P4) site. The aim of testing is to assess and check the pile integrity for potential problems like cross –sectional changes, honeycombing, concrete quality, continuity etc. The field tests were conducted on 29th December, 2022. Testing was conducted by Mr. Prashanta Poudel and Mr. Dipankar Modak. The tests were conducted in accordance with IS:14893-2021 and ASTM -D5882.
This report presents the results of pile integrity testing using the Pile Integrity Tester, PIT, based on the details available and the site conditions at the time of testing. The report is on the basis of pile locations and field information provided by the client.
.